Historic structures report
HISTORIC STRUCTURES REPORT
for the
CSPS Hall
of the
Czech and Slovak Sokol Minnesota
CSPS HALL COST ESTIMATE
The costs provided below reflect the construction climate as of October 2008 and include general contractor overhead and profit mark-ups.
Costs are based on HomeTech Remodeling and Renovation
Cost Estimator and RS Means.
|
Costs in this section do notinclude contingencies or professional fees. |
|||
|
Item |
Cost |
Priority |
Comments |
|
SITE |
|||
|
Install new sidewalk at east side of building |
5,000 |
1 |
Potential safety issue |
|
Trim or remove trees at west side of building |
2,000 |
3 |
Helps to prevent longer term deterioration |
|
Regrade at rear of building |
2,500 |
2 |
Helps keep water out of the building |
|
Extend downspouts at rear of building |
2,000 |
1 |
Helps keep water out of the building |
|
MASONRY |
|||
|
Chimney repairs |
3,000 |
3 |
Minor repair |
|
Parapet coping tile replacement and repair |
2,500 |
2 |
Helps keep water out |
|
Basement floor improvement |
35,000 |
3 |
Optional. Exact treatment to be determined |
|
Repoint areas of deterioration at foundation walls in basement |
5,000 |
3 |
Mostly aesthetic |
|
MISCELLANEOUS |
|||
|
Install sealant at basement window coverings |
1,000 |
1 |
Helps keep water out of the building |
|
Install cover over mechanical areaway to basement |
1,000 |
1 |
Helps keep water out of the building |
|
Painting |
12,000 |
3 |
Primarily aesthetic improvement |
|
Paint metal roofs over entries |
8,000 |
2 |
Prevents deterioration and improves aesthetics |
|
Install plinth blocks at basement columns |
5,000 |
2 |
Prevents further deterioration |
|
Assorted weatherstripping |
1,500 |
2 |
Improves energy effeciency |
|
Minor repairs to interior doors, cabinets, trap doors to attic |
4,000 |
3 |
Primarily aesthetic improvement |
|
REMODELING |
|||
|
Third floor egress stair |
7,500 |
3 |
Improves emergency exiting from third floor |
|
Remodeled 1st floor, elevator lobby to offices, shop, etc. |
40,000 |
3 |
Improves use of first floor |
|
New basement stair |
7,500 |
3 |
Improves use of first floor |
|
Storage and corridor remodel at 1st floor |
15,000 |
3 |
Improves use of first floor |
|
ELEVATOR |
|||
|
Extend elevator to 3rd floor, including exterior construction |
100,000 |
1 |
Makes third floor accessible |
|
PLUMBING |
|||
|
Second floor rest room remodeling |
20,000 |
2 |
Provides accessible rest rooms to main floor |
|
MECHANICAL |
|||
|
Second and 3rd floor air conditioning |
15,000 |
1 |
Allows year-round use of main floor |
|
Relocate air handling unit from basement |
2,000 |
2 |
Reduces heat buildup |
|
Reactivate ventilation system in gymnasium/dance hall |
2,500 |
3 |
Inexpensive way to improve temperature in summer |
|
ELECTRICAL |
|||
|
Electrical upgrades for additional air conditioning |
5,000 |
1 |
Required for air conditioning |
|
New light fixtures in 2nd floor restrooms |
500 |
2 |
Aesthetic improvement |
Costs by Priority
Total costs within this section include contingencies and professional fees.
|
Priority One Items |
|||
|
Item |
Cost |
Priority |
Comments |
|
Extend elevator to third floor |
100,000 |
1 |
Makes third floor accessible |
|
Second and third floor air conditioning |
15,000 |
1 |
Allows year-round use of main floor |
|
Electrical upgrades for air conditioning |
5,000 |
1 |
Required for air conditioning |
|
Third floor egress stair |
10,500 |
1 |
Improves emergency exiting from third floor |
|
Install new sidewalk on east side of building |
5,000 |
1 |
Potential safety issue |
|
Extend downspouts at rear of building |
2,000 |
1 |
Helps keep water out of the building |
|
Install sealant at basement window coverings |
1,000 |
1 |
Helps keep water out of the building |
|
Install cover over mechanical areaway to basement |
1,000 |
1 |
Helps keep water out of the building |
|
Base construction cost |
139,500 |
||
|
Contiungencies, assume 25% contiungency |
34,875 |
||
|
Professional fees, assume 15% |
26,156 |
||
|
Total for Priority One Items |
$200,531 |
||
|
Priority Two Items |
|||
|
Item |
Cost |
Priority |
Comments |
|
Regrade at rear of building |
2,500 |
2 |
Helps keep water out of the building |
|
Parapet coping tile replacement and repair |
2,500 |
2 |
Helps keep water out |
|
Paint metal roofs over entries |
8,000 |
2 |
Prevents deterioration and improves aesthetics |
|
Install plinth blocks at basement columns |
5,000 |
2 |
Prevents further deterioration |
|
Assorted weatherstripping |
1,500 |
2 |
Improves energy effeciency |
|
Second floor restroom remodeling |
20,000 |
2 |
Provides accessible rest rooms to main floor |
|
Relocate air handling unit from basement |
2,000 |
2 |
Reduces heat buildup |
|
New light fixtures in second floor restrooms |
500 |
2 |
Aesthetic improvement |
|
Base construction cost |
42,000 |
||
|
Contiungencies, assume 25% contiungency |
10,500 |
||
|
Professional fees, assume 20% |
10,500 |
||
|
Total for Priority Two Items |
$63,000 |
||
|
Priority Three Items |
|||
|
Item |
Cost |
Priority |
Comments |
|
Reactivate ventilation system in gymnasium/dance hall |
2,500 |
3 |
Inexpensive way to improve temperature in summer |
|
Trim or remove trees at west side of building |
2,000 |
3 |
Helps to prevent longer term deterioration |
|
Chimney repairs |
3,000 |
3 |
Minor repair |
|
Basement floor improvement, repoint partial walls |
35,000 |
3 |
Optional. Exact treatment to be determined |
|
Repoint partial foundation walls in basement |
5,000 |
3 |
Mostly aesthetic |
|
Painting |
12,000 |
3 |
Primarily aesthetic improvement |
|
Minor repairs to interior doors, cabinet, trap door, etc |
4,000 |
3 |
Primarily aesthetic improvement |
|
Remodeled first floor, elevator lobby to offices, shops |
40,000 |
3 |
Improves use of first floor |
|
New basement stair |
7,500 |
3 |
Improves use of first floor |
|
Storage and corridor remodel at first floor |
15,000 |
3 |
Improves use of first floor |
|
Base construction cost |
126,000 |
||
|
Contiungencies, assume 25% contiungency |
31,500 |
||
|
Professional fees, assume 20% |
31,500 |
||
|
Total for Priority Three Items |
189,000 |
||
|
Total cost for all three priorities |
452,531 |
||